International Journal of Mechanical and Industrial Engineering IJMIE

ISSN: 2231-6477

Conference
ijcct journal

Abstracting and Indexing

Crossref logo
IIMT Bhubaneswar

IJMIE

Productivity enhancement by reducing adjustment time and setup change


M.S. Desai
Government engineering college Aurangabad. Aurangabad ( M.S.) India.

R.M. Warkhedkar
Government engineering college Aurangabad. Aurangabad ( M.S.) India.


Abstract

The paper presents a study of set-up time reduction in a small factory involved in the machining of precision components in small batches with large variety for the automobile industry. The factory has made some set-up reductions mainly using work study related methods and in one manufacturing cell by the use of the Single Minute Exchange of Die (SMED) methodology. Until recently the set-up times were not measured and worse still were considered as productive hours. As a consequence, there was a lack of awareness and motivation amongst operational personnel to reduce set-up times and knowledge of SMED was limited to a small group of individuals. This, along with the lack of investment in mechanisms to aid set-up time reductions and prevent errors, has restricted the use of this type of methods and technology. However, there is evidence that the demands made by the factory’s major customer will lead to increased efforts to put into place these types of changes.

Recommended Citation

1) Shingo, Singo, “A Revolution in Manufacturing”: the SMED
System, Productivity Press, Cambridge, MA. Shingo, S.
(1985b), Zero Quality Control: Source Inspection and the Poka
Yoke System, Productivity Press, Cambridge, MA.
2) S.Patel, P.Shaw and B.G.Dale, “Set-up time reduction and
mistake proofing methods: A study of application in a small
factory” Business Process Management Journal, vol No.
1,2001,pp.65-75.
3) B.Kayis, S Kara, “Set-up Reduction (SUR ) in Injection
Molding Process- A Study in packing Industry”,4 th
International Conference and Exhibition on Design and
Productivity of Machine and Dies / Moulds, Cesme, Turkey, 21-
23/6/2007
4) Ali Allahverdi & H.M. Soroush, “The significance of reducing
setup times/setup costs”
European Journal of Operational Research 187 (2008) 978–
984
5) Subhashish Samaddar, Craig A. Hill, “Controlling adverse
effect on work in process inventory while reducing machine
setup time”, European Journal of Operational Research 180
(2007) 249–261
6) Jeffrey E. Schaller b. Jatinder N.D. Gupta,“ Single machine
scheduling with family setups to
8) Kuo-Lung Hou, “ An EPQ model with setup cost and process
quality as functions of capital expenditure”, Applied
Mathematical Modeling 31 (2007) 10–17
9) Michele Ciavotta , Paolo Detti , Carlo Meloni , Marco Pranzo,
“A bi-objective coordination setup problem in a two-stage
production system”, European Journal of Operational
Research 189 (2008) 734–745
10) Dirk Van Goubergen, Hendrik Van Landeghem, “A
Quantitative Approach for Set-Up Reduction of Machine
Lines”, Production and Inventory Management Journal, 1990.
31(4): p. 55-59.
11) Dirk Van Goubergen, Hendrik Van Landeghem, “An
Integrated Methodology for More Effective Set-up Reduction”
Production and Inventory Management Journal, 1994. 60 (2):
p. 45-59
12) Mehmet Cakmakci, “Process improvement: performance
analysis of the setup time reduction-SMED in the automobile
industry” Springer-Verlag London Limited 2008
13) Dirk Van Goubergen, Hendrik Van Landeghem, “Reducing
Set-up Times of Manufacturing Lines” International
Conference on Flexible Automation and Intelligent
Manufacturing 2002, Dresden, Germany
14) Mehmet Cakmakci . Mahmut Kemal Karasu, “Set-up time
reduction process and integrated predetermined time system
MTM-UAS: A study of application in a large size factory of
automobile industry” Springer-Verlag London Limited 2006
15) Dirk Van Goubergen, Hendrik Van Landeghem, “An
Integrated Methodology for More Effective Set-up Reduction”,
Proc. IIE Solutions 2000, Cleveland (OH)

Download pdf viewer for your browser, if the PDF cannot be displayed.